General Scope of Project: Demolition, renovation and new construction for miscellaneous modernization improvements to the interior and exterior of the Warehouse Bldg. 9201 in Tinker Air Force Base (AFB), Oklahoma. Goal: To renovate part of existing Bldg. 9201 into a warehouse. Area of work will include design and construction between column lines 7 and 11W, and PA PEs. Minor site improvements include repairing existing concrete pavement in front of new overhead door and repairing west exterior wall of new warehouse area. Modification to existing sprinkler system as well as installation of new fire alarm / mass notification system. Potentially a new fire pump at a central location will be required based on requirements for a 90,000 sf. warehouse. Construction of new fire wall and new fire extinguishers to be provided.