General Scope of Project: This work involved a complete restoration effort that included, grinding and pointing (100%), stone façade repair, steel spandrel repair and replacement.
In two locations, a structural steel element needed to be replaced. This required the placement of temporary shoring to safely replace steel framework buried inside the masonry walls.